Test Plan
Version 1.2
Revision
History
DATE
|
Version
|
AUTHOR
|
DESCRIPTION
|
01/07/12
|
1.0
|
Ram
|
First Draft
|
10/07/12
|
1.1
|
Ram
|
Second Draft
|
15/07/12
|
1.2
|
Ram
|
Added FTBT
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Table of
Contents
1. Introduction..................................................................................................................... 4
1.1. Test Plan Objectives.................................................................................................. 4
2. Scope............................................................................................................................. 4
2.1. Data Entry................................................................................................................ 4
2.2. ReportsFile Transfer.................................................................................................. 4
2.3. File Transfer.............................................................................................................. 4
2.4. Security....................................................................................................................... 4
3. Test Strategy................................................................................................................... 5
3.1. System Test................................................................................................................. 5
3.2. Performance
Test......................................................................................................... 5
3.3. Security Test................................................................................................................ 5
3.4. Automated Test............................................................................................................ 5
3.5. Stress and Volume
Test................................................................................................ 5
3.6. Recovery Test.............................................................................................................. 5
3.7. Documentation
Test...................................................................................................... 5
3.8. Beta Test...................................................................................................................... 5
3.9. User Acceptance
Test................................................................................................... 5
4. Environment Requirements............................................................................................... 6
4.1. Data Entry workstations................................................................................................ 6
4.2 MainFrame.................................................................................................................... 6
5. Test Schedule.................................................................................................................. 6
6. Control Procedures.......................................................................................................... 6
6.1 Reviews........................................................................................................................ 6
6.2 Bug Review meetings..................................................................................................... 6
6.3 Change Request............................................................................................................ 6
6.4 Defect Reporting........................................................................................................... 6
7. Functions To Be Tested................................................................................................... 7
8. Resources and Responsibilities.......................................................................................... 7
8.1. Resources.................................................................................................................... 7
8.2. Responsibilities......................................................................................................... 7
9. Deliverables.................................................................................................................... 8
10. Suspension / Exit Criteria................................................................................................ 9
11. Resumption Criteria.......................................................................................................... 9
12. Dependencies................................................................................................................. 9
12.1 Personnel Dependencies........................................................................................... 9
12.2 Software Dependencies............................................................................................. 9
12.3 Hardware Dependancies............................................................................................ 9
12.3 Test Data & Database............................................................................................... 9
13. Risks.............................................................................................................................. 9
13.1. Schedule.................................................................................................................... 9
13.2. Technical.................................................................................................................... 9
13.3. Management............................................................................................................... 9
13.4. Personnel................................................................................................................. 10
13.5 Requirements............................................................................................................. 10
14. Tools.............................................................................................................................. 10
15. Documentation.............................................................................................................. 10
16. Approvals....................................................................................................................... 10
1. Introduction
The company has outgrown its
current payroll system & is developing a new system that will allow for
further growth and provide additional features. The software test department
has been tasked with testing the new system.
The new system will do the
following:
§
Provide the users with menus, directions &
error messages to direct him/her on the various options.
§
Handle the update/addition of employee
information.
§
Print various reports.
§
Create a payroll file and transfer the file to
the mainframe.
§
Run on the Banyan Vines Network using IBM
compatible PCs as data entry terminals
1.1. Test Plan Objectives
This Test Plan
for the new Payroll System supports the following objectives:
§
Define the activities required to prepare for and
conduct System, Beta and User Acceptance testing.
§
Communicate to all responsible parties the
System Test strategy.
§
Define deliverables and responsible parties.
§
Communicate to all responsible parties the
various Dependencies and Risks
2. Scope
2.1. Data Entry
The new payroll system should allow the payroll clerks to enter
employee information from IBM compatible PC workstations running DOS 3.3 or
higher. The system will be menu driven and will provide error messages to help
direct the clerks through various options.
2.2. Reports
The
system will allow the payroll clerks to print 3 types of reports. These reports
are:
§ A
pay period transaction report
§
A pay period exception report
§
A three month history report
2.3. File Transfer
Once the employee information is entered into the LAN database, the
payroll system will allow the clerk to create a payroll file. This file can
then be transferred, over the network, to the mainframe.
2.4. Security
Each payroll clerk will need a userid and password to login to the
system. The system will require the clerks to change the password every 30
days.
3. Test Strategy
The
test strategy consists of a series of different tests that will fully exercise
the payroll system. The primary purpose of these tests is to uncover the
systems limitations and measure its full capabilities. A list of the various
planned tests and a brief explanation follows below.
3.1. System Test
The System tests will
focus on the behavior of the payroll system. User scenarios will be executed
against the system as well as screen mapping and error message testing.
Overall, the system tests will test the integrated system and verify that it
meets the requirements defined in the requirements document.
3.2. Performance Test
Performance test will be conducted to ensure that the payroll system’s
response time meet the user expectations and does not exceed the specified
performance criteria. During these tests, response times will be measured under
heavy stress and/or volume.
3.3. Security Test
Security tests will determine how secure the new payroll system is. The
tests will verify that unauthorized user access to confidential data is
prevented.
3.4. Automated Test
A suite of automated
tests will be developed to test the basic functionality of the payroll system
and perform regression testing on areas of the systems that previously had
critical/major defects. The tool will also assist us by executing user
scenarios thereby emulating several users.
3.5. Stress and Volume Test
We will subject the
payroll system to high input conditions and a high volume of data during the
peak times. The System will be stress tested using twice (20 users) the number
of expected users.
3.6. Recovery Test
Recovery tests will force the system to fail in a various ways and
verify the recovery is properly performed. It is vitally important that all
payroll data is recovered after a system failure & no corruption of the
data occurred.
3.7. Documentation Test
Tests will be conducted
to check the accuracy of the user documentation. These tests will ensure that
no features are missing, and the contents can be easily understood.
3.8. Beta Test
The Payroll department
will beta tests the new payroll system and will report any defects they find.
This will subject the system to tests that could not be performed in our test
environment.
3.9. User Acceptance Test
Once the payroll system is ready for implementation, the Payroll
department will perform User Acceptance Testing. The purpose of these tests is
to confirm that the system is developed according to the specified user
requirements and is ready for operational use.
4. Environment Requirements
4.1. Data Entry workstations
§ 20
IBM compatible PCs (10 will be used by the automation tool to emulate payroll
clerks).
§
286 processor (minimum)
§
4mb RAM
§
100 mb Hard Drive
§
DOS 3.3 or higher
§
Attached to Banyan Vines network
§
A Network attached printer
§
20 user ids and passwords (10 will be used by
the automation tool to emulate payroll clerks).
4.2 MainFrame
§ Attached
to the Banyan Vines network
§
Access to a test database (to store payroll
information transferred from LAN payroll system)
5. Test Schedule
§
Ramp up / System familiarization 01/06/06 - 15/06/06
§ System
Test 16/06/06 - 26/06/06
§
Beta Test 28/06/06 - 08/07/06
§
User Acceptance Test 09/07/06 - 09/07/06
6. Control Procedures
6.1 Reviews
The project team will perform reviews for each Phase. (i.e.
Requirements Review, Design Review, Code Review, Test Plan Review, Test Case
Review and Final Test Summary Review). A meeting notice, with related
documents, will be emailed to each participant.
6.2 Bug Review meetings
Regular weekly meeting will be held to discuss reported defects. The
development department will provide
status/updates on all defects reported and the test department will
provide addition defect information if needed. All member of the project team
will participate.
6.3 Change Request
Once testing begins, changes to the payroll system are discouraged. If
functional changes are required, these proposed changes will be discussed with
the Change Control Board (CCB). The CCB will determine the impact of the change
and if/when it should be implemented.
6.4 Defect Reporting
When defects are found, the testers will complete a defect report on
the defect tracking system. The defect tracking Systems is accessible by testers, developers & all members
of the project team. When a defect has been fixed or more information is
needed, the developer will change the status of the defect to indicate the
current state. Once a defect is verified as FIXED by the testers, the testers
will close the defect report.
7. Functions To Be Tested
The following is
a list of functions that will be tested:
§
Add/update employee information
§
Search / Lookup employee information
§
Escape to return to Main Menu
§
Security features
§
Scaling to 700 employee records
§
Error messages
§
Report Printing
§
Creation of payroll file
§
Transfer of payroll file to the mainframe
§
Screen mappings (GUI flow). Includes default
settings
§
FICA Calculation
§
State Tax Calculation
§
Federal Tax Calculation
§
Gross pay Calculation
§
Net pay Calculation
§
Sick Leave Balance Calculation
§
Annual Leave Balance Calculation
A Requirements Validation Matrix
will “map” the test cases back to the requirements. See Deliverables.
8. Resources and Responsibilities
The Test Lead
and Project Manager will determine when system test will start and end. The
Test lead will also be responsible for coordinating schedules, equipment, &
tools for the testers as well as writing/updating the Test Plan, Weekly Test
Status reports and Final Test Summary report. The testers will be responsible
for writing the test cases and executing the tests. With the help of the Test
Lead, the Payroll Department Manager and Payroll clerks will be responsible for
the Beta and User Acceptance tests.
8.1. Resources
The test team will consist of:
§
A Project Manager
§
A Test Lead
§
5 Testers
§
The Payroll Department Manager
§
5 Payroll Clerks
8.2. Responsibilities
Project Manager
|
Responsible
for Project schedules and the overall success of the project. Participate on
CCB.
|
|
|
Lead Developer
|
Serve as a primary
contact/liaison between the development department and the project team.
Participate on CCB.
|
|
|
|
|
Test Lead
|
Ensures the overall success of
the test cycles. He/she will coordinate weekly meetings and will communicate
the testing status to the project team.
Participate on CCB.
|
|
|
Testers
|
Responsible for performing the
actual system testing.
|
|
|
Payroll Department Manager
|
Serves as Liaison between
Payroll department and project team. He/she will help coordinate the Beta and
User Acceptance testing efforts. Participate on CCB.
|
|
|
Payroll Clerks
|
Will assist in performing the
Beta and User Acceptance testing.
|
9. Deliverables
Deliverable
|
Responsibility
|
Completion
Date
|
|
|
|
Develop Test cases
|
Testers
|
|
|
|
|
Test Case Review
|
Test Lead, Dev. Lead, Testers
|
|
|
|
|
Develop Automated test suites
|
Testers
|
|
|
|
|
Requirements Validation Matrix
|
Test Lead
|
|
|
|
|
Obtain User ids and Passwords
for payroll system/database
|
Test Lead
|
|
|
|
|
Execute manual and automated
tests
|
Testers & Test Lead
|
|
|
|
|
Complete Defect Reports
|
Everyone testing the product
|
On-going
|
|
|
|
Document and communicate test
status/coverage
|
Test Lead
|
Weekly
|
|
|
|
Execute Beta tests
|
Payroll Department Clerks
|
|
|
|
|
Document and communicate Beta
test status/coverage
|
Payroll Department Manager
|
|
|
|
|
Execute User Acceptance tests
|
Payroll Department Clerks
|
|
|
|
|
Document and communicate
Acceptance test status/coverage
|
Payroll Department Manager
|
|
|
|
|
Final Test Summary Report
|
Test Lead
|
|
10. Suspension / Exit Criteria
If any defects are found which
seriously impact the test progress, the QA manager may choose to
Suspend testing. Criteria that
will justify test suspension are:
§
Hardware/software is not available at the times
indicated in the project schedule.
§
Source code contains one or more critical
defects, which seriously prevents or limits testing progress.
§
Assigned test resources are not available when
needed by the test team.
11. Resumption Criteria
If testing is
suspended, resumption will only occur when the problem(s) that caused the
suspension has been resolved. When a critical defect is the cause of the
suspension, the “FIX” must be verified by the test department before testing is
resumed.
12. Dependencies
12.1 Personnel Dependencies
The test team
requires experience testers to develop, perform and validate tests. These
The test team
will also need the following resources available: Application developers and
Payroll Clerks.
12.2 Software Dependencies
The source code must be unit tested and provided within the scheduled
time outlined in the Project Schedule.
12.3 Hardware Dependencies
The Mainframe, 10 PCs
(with specified hardware/software) as well as the LAN environment need to be available
during normal working hours. Any downtime will affect the test schedule.
12.3 Test Data & Database
Test data (mock
employee information) & database should also be made available to the
testers for use during testing.
13. Risks
13.1. Schedule
The schedule for each phase is very aggressive and could affect
testing. A slip in the schedule in one of the other phases could result in a
subsequent slip in the test phase. Close project management is crucial to
meeting the forecasted completion date.
13.2. Technical
Since this is a
new payroll system, in the event of a failure the old system can be used. We
will run our test in parallel with the production system so that there is no
downtime of the current system.
13.3. Management
Management
support is required so when the project falls behind, the test schedule does
not
get squeezed to
make up for the delay. Management can reduce the risk of delays by supporting
the test team throughout the testing phase and assigning people to this project
with the required skills set.
13.4. Personnel
Due to the
aggressive schedule, it is very important to have experienced testers on this
project. Unexpected turnovers can impact the schedule. If attrition does
happen, all efforts must be made to replace the experienced individual
13.5 Requirements
The test plan
and test schedule are based on the current Requirements Document. Any changes
to the requirements could affect the test schedule and will need to be approved
by the CCB.
14. Tools
The Acme Automated test tool will
be used to help test the new payroll system. We have the licensed product
onsite and installed. All of the testers have been trained on the use of this
test tool.
15. Documentation
The following documentation will
be available at the end of the test phase:
§ Test
Plan
§
Test Cases
§
Test Case review
§
Requirements Validation Matrix
§
Defect reports
§
Final Test Summary Report
16. Approvals
Name (Print)
|
Signature
|
Date
|
|
|
|
1.
|
|
|
|
|
|
2.
|
|
|
|
|
|
3.
|
|
|
|
|
|
4.
|
|
|
|
|
|
5.
|
|
|